Byerwen Coal Project
Status
Approved with conditions
Project overview*
| EIS status | Approved with conditions |
| Description | Open-cut coal mine with a yield of up to 10 million tonnes per annum. |
| Proponent | Byerwen Coal Pty Ltd (joint venture between QCoal Pty Ltd and JFE Steel) |
| Location/s | Northern Bowen Basin, 20 km west of Glenden and 140 km west of Mackay. |
| Local government/s |
|
| Investment | $1.76 billion |
| Key features |
|
| Jobs |
|
* Project information supplied by proponent and subject to change.
Environmental impact statement (EIS) process
| Date | Activity |
|---|---|
| 2 October 2014 | Commonwealth Minister for the Environment's approval of 'controlled action', subject to conditions. |
| 2 July 2014 | Coordinator-General's Report for the Byerwen Coal project ( |
|
29 January 2014 to 25 February 2014 | Additional information for the EIS and submissions being assessed by other government agencies. |
| 16 September 2013 | Additional information for the EIS requested by Coordinator-General. |
|
8 June 2013 to 23 July 2013 |
Draft EIS public consultation
|
| 19 July 2011 | Terms of reference for EIS ( |
|
9 April 2011 to 16 May 2011 | Draft terms of reference for EIS public consultation. |
1 March 2011 | Gazettal of 'coordinated project' declaration ( |
4 February 2011 | Application, including initial advice statement ( |
| 13 January 2011 | Project deemed a 'controlled action' by Commonwealth Minister for the Environment. |
| 14 December 2010 | Project referred to Commonwealth Minister for the Environment. |
Read more about the EIS process.
Project changes
Project change application – Relocation of Southern Infrastructure
| Date | Activity |
|---|---|
| 3 July 2015 | Coordinator-General's report on project change ( |
| 2 June 2015 |
Proponent's project change application submitted ( |
Annual report to the Coordinator-General
The proponent is required to submit an annual report to the Coordinator-General.
If you have difficulty downloading documents, please email cpdinfo@coordinatorgeneral.qld.gov.au
EIS - Chapters
- Executive Summary (
6.74 MB) - EIS Cover Page (
1.22 MB) - EIS Table of Contents (
2.1 MB) - 01 – Introduction (
2.78 MB) - 02 – Project Rationale and Alternatives (
2.36 MB) - 03 – Project Approvals (
2.18 MB) - 04 – Public Consultation (
2.48 MB) - 05 – Project Location (
6.31 MB) - 06 – Construction (
2.83 MB) - 07 – Operation (
5.33 MB) - 08 – Water Management (
29.3 MB) - 09 – Waste Rock and Rejects (
2.57 MB) - 10 – Decommissioning and Rehabilitation (
5.71 MB) - 11 – Final Voids (
2.45 MB) - 12 – Climate and Climate Change (
2.49 MB) - 13 – Geology, Topography and Soils (
3.68 MB) - 14 – Land Use, Tenure and Contamination (
5.85 MB) - 15 – Surface Water Quality (
6.4 MB) - 16 – Hydrology and Hydraulics (
10.6 MB) - 17 – Groundwater (
4.0 MB) - 18 – Terrestrial Ecology (
7.57 MB) - 19 – Aquatic Ecology (
2.83 MB) - 20 – Stygofauna (
2.4 MB) - 21 – Environmental Offsets (
2.43 MB) - 22 – Air Quality (
2.43 MB) - 23 – Greenhouse Gas (
1.95 MB) - 24 – Noise and Vibration (
4.17 MB) - 25 – Landscape and Visual Amenity (
4.04 MB) - 26 – Waste Management (
2.02 MB) - 27 – Traffic and Transport (
2.6 MB) - 28 – Indigenous Cultural Heritage (
2.24 MB) - 29 – Historical Cultural Heritage (
2.7 MB) - 30 – Economics (
2.23 MB) - 31 – Social Impacts (
2.82 MB) - 32 – Hazard and Risk (
2.3 MB) - 33 – Health and Safety (
2.03 MB) - 34 – Cumulative Impact Assessment (
3.15 MB) - 35 – Matters of National Environmental Significant (
7.16 MB) - 36 – References (
2.06 MB)
EIS - Appendices
- Appendix 1 – Terms of Reference (
2.17 MB) - Appendix 2 – TOR Cross Reference Table (
2.78 MB) - Appendix 3 – Project Approvals (
2.0 MB) - Appendix 4 – Study Team (
2.0 MB) - Appendix 5 – Glossary (
2.07 MB) - Appendix 6 – Acronyms and Abbreviations (
1.97 MB) - Appendix 7 – Corporate Environment Policy (
1.96 MB) - Appendix 8 – Commitments (
2.23 MB) - Appendix 9 – Environmental Management Plan (
30.4 MB) - Appendix 10 – Social Impact Management Plan (
3.33 MB) - Appendix 11 – Mine Water Management Strategy (
7.24 MB) - Appendix 12 – Geochemical Access of Spoil and Potential Coal Reject Materials (
4.07 MB) - Appendix 13 – Final Void Assessment (
4.9 MB) - Appendix 14 – Land Technical Report (
25.2 MB) - Appendix 15 – Preliminary Site Investigation Contaminated Land (
4.7 MB) - Appendix 16 – Assessment of Surface Water Environmental Values (
6.6 MB) - Appendix 17 – Hydrology and Flooding Assessment Report (
9.94 MB) - Appendix 18 – Groundwater Assessment (
7.94 MB) - Appendix 19 – Terrestrial Ecology Assessment (
38.0 MB) - Appendix 20 – Aquatic Ecology Assessment (
6.55 MB) - Appendix 21 – Stygofauna Pilot Survey (
3.63 MB) - Appendix 22 – Matters of Environmental Significance Assessment Report (
12.8 MB) - Appendix 23 – Air and Greenhouse Gas Assessment (
4.71 MB) - Appendix 24 – Noise and Vibration Assessment (
4.08 MB) - Appendix 25 – Visual Impact Assessment (
15.2 MB) - Appendix 26 – Transport Impact Assessment Report (
4.15 MB) - Appendix 27 – Non-Indigenous History Technical Report (
2.77 MB) - Appendix 28 – Indigenous Cultural Heritage Birri Native Title Area (
4.9 MB) - Appendix 29 – Indigenous Cultural Heritage Jangga Native Title Area (
3.74 MB) - Appendix 30 – Economic Impact Assessment (
8.87 MB) - Appendix 31 – Social Impact Assessment (
3.77 MB) - Appendix 32 – Hazard and Risk Assessment Report (
7.12 MB) - Appendix 33 – Draft Emergency Management (
1.96 MB)
Further information
The Coordinator-General has imposed a condition requiring the proponent to provide an annual report for a period of five years from the commencement of construction. The reports will be made publicly available, and should describe the actions, outcomes and adaptive management strategies to:
- avoid, manage or mitigate project-related impacts on local and regional housing markets
- enhance local employment, training and development opportunities
- avoid, manage or mitigate project-related impacts on local community services, social infrastructure and community safety and wellbeing
- inform the community about project impacts and show that community concerns about project impacts have been taken into account when reaching decisions.
Download reports
- Byerwen Coal Project - 2020 Annual Report to the Coordinator-General (
397 KB) - Byerwen Coal Project - 2019 Annual Report to the Coordinator-General (
4.9 MB) - Byerwen Coal Project - 2018 Annual Report to the Coordinator-General (
2.8 MB) - Byerwen Coal Project - 2017 Annual Report to the Coordinator-General (
402 KB) - Byerwen Coal Project - 2016 Annual Report to the Coordinator-General (
625 KB)
Further information
Last updated: 25 August 2026